Crew Scheduling: Set Up General Settings
General settings control how the schedule behaves for everyone at your site, including the time resolution, which rows appear under each asset, and which features are turned on. You can also use them to limit which crew can be scheduled on your assets.
For where to start and how the settings pages work together, see "Crew Scheduling: Introduction to Setup."
Set Up General Settings
You can set up your general settings on the General settings page, which you open from the Personnel > Schedule > Schedule tab. It includes the Scheduler section and the Who can be crewed on an asset section.
To set up your general settings
- Go to the Personnel > Schedule > Schedule tab.
- Click the Settings icon. The settings open on the General page.
- Under Scheduler, in the Time Resolution fields, select a Unit and enter an Increment.
- Turn on the toggles for the features you want to use.
- Click SAVE.
Time Resolution
Time Resolution is the smallest unit the timeline snaps to when you draw a schedule. The Unit (Day, Hour, or Minute) and the Increment work together. For example, a unit of Day with an increment of 1 snaps to one-day boundaries, and a unit of Hour with an increment of 6 snaps to six-hour boundaries.
The Scheduler Toggles
The table below describes what happens when you turn each toggle on.
| Toggle | What Turning It On Does |
|---|---|
| Show Crewing Requirements Rows | Shows the Job / Crewing Requirement row beneath each asset. |
| Show Crew Change Rows | Shows the Crew Changes row, with a bubble for each crew change and its publish state. |
| Individual Insertion | Adds only one schedule at a time when you draw. |
| Disable move & resize | Locks the schedule against dragging. Schedules can then be changed only in the edit window. |
| Enable Merge Crew Change Bubbles | Collapses crew changes that sit next to each other into a single bubble to keep the row readable. |
| Enable Bulk Publish | Adds the BULK PUBLISH button to the schedule toolbar. |
| Enable Custom Colors | Adds the paint bucket icon to the schedule toolbar, so you can change the color of schedules. See "Crew Scheduling: Create and Edit Schedules." |
| Enable Bar Overlap | Lets you set a threshold in minutes. Schedules that fall within that threshold of each other appear on the same row, and schedules further apart stay on separate rows. |
| Crew Changes Created From Schedule Are Published By Default | Publishes the crew changes you draw on the schedule as soon as they're created. |
| Show Certification Warnings | Flags schedules whose crew member is missing a required certification. On by default. |
| Show Safe Manning | Shows the Safe Manning row above each asset, which tells you whether the asset meets the safe manning requirements you set up on the Management > Certifications > Certification Requirements tab. Off by default, and available only if you use the new version of the Crew Certifications module. |
| Hide Cancelled and Declined Time Off | Hides time off requests that were cancelled or declined, which reduces clutter on the schedule. |
Choose Who Can Be Crewed on an Asset
The Who can be crewed on an asset section limits which crew Helm CONNECT offers when you click into a position on the schedule. You can limit the list by department or by position, but not both. If you leave both empty, these settings don't limit the list.
To limit who can be crewed on an asset
- Go to the Personnel > Schedule > Schedule tab.
- Click the Settings icon.
- Under Who can be crewed on an asset, do one of the following:
- From the Select Departments list, select the departments you want to allow.
- From the Select Positions list, select the positions you want to allow.
- Click SAVE.